At California Coastal Commission hearing 4/11/13, Commission staff withdrew the proposed Pillar Point Harbor dredging permit waiver for launch ramp dredging and placement of 5,600 cubic yards of dredge material on Perched Beach next to the kayak stand (waiver & public comments). Staff will do additional analysis to bring to a future meeting. In the meantime the launch ramp dredging is on hold.