Hwy 1 Surfers' Beach Project Starts Nov 23

Over the next few months Caltrans will install 175-linear feet of rock slope protection on Surfers’ Beach as an interim solution (10-15 years) to reduce erosion and prevent collapse of Highway 1. The project includes paving a 400-foot section of the Coastal Trail along the west side of the highway and a staircase down to the beach.

Construction activities will occur between 7AM and 3:30 PM, although some night work may be required.  Minimal lane closures may take place. The pedestrian trail will be temporarily detoured. Construction is expected to be complete by Jan 2016.

This slide presentation includes project plan view and beach cross section.
This press release provides more background.
See MCC Surfers' Beach page and Caltrans project page for more info. 

MCC Meeting November 18, 2015

Agenda for November 18, 2015, 7:00 PM
GCSD meeting room, 504 Ave Alhambra, 3rd floor, El Granada

Midcoast Highway 1 Crossings, Raised Medians, Left Turn Lanes:
Aug 2015 Final Preliminary Planning Study (19MB).
Preferred alternatives & implementation plan: Chapter 6.
Grey Whale Cove Alt 1  -- Lighthouse/16th Alt 1
Moss Beach Virginia Alt 3 -- Montara 2nd St Alt 3
More background: Hwy 1 Crossings page

Consent agenda: Minutes for Oct 28, 2015

UPDATE:  11/18/15 meeting video & minutes

MCC Meeting October 28, 2015

Agenda for October 28, 2015, 7:00 PM
GCSD meeting room, 504 Ave Alhambra, 3rd floor, El Granada

Connect the Coastside - MCC comments (as approved)
background documents:
10/14/15 MCC Briefing -- minutes 
Oct 2015 Alternative Development Forecast & Transportation Standards
Apr 2015 workshop - summary of comments - group statement
Dec 2014 Buildout Analysis & Traffic Projections Report (see p.51-64)

Plan Princeton Development Standards - MCC comments approved (map)
attachment: 2009 MCC comments         More info: Princeton page

Consent Agenda: 4 items approved:
Minutes for October 14, 2015.
MCC comments on Magellan fence, PLN2015-00445
MCC letter to MBNMS in support of beach replenishment policy
     (referenced 8/19/15 Harbor District letter)
MCC letter to Planning requesting Pre-App Workshop for Vallemar Bluff

UPDATE: 10/28/15 meeting video & minutes